Digital Transformation Infrastructure – Smouha University Hospital
Implementation of the passive digital transformation infrastructure at Smouha University Hospital in Alexandria as part of the University Hospitals development project, including 250 data points and the supporting structured network infrastructure.
Project Gallery
Case Study
Project Overview
Executed Services
- Data Networks
- Fiber Optics
- Wi-Fi Solutions
- Fire Alarm Systems
- Data Centres Infrastructure
- Structured Cabling Systems
- IP/PBX/Telephone Systems
The Solution
Project Challenges & Solutions
Explore the project challenges and the solutions delivered for each one.
The project required a reliable network infrastructure to be implemented within an operating healthcare facility, distributing data connectivity across multiple functional areas while maintaining an organized centralized infrastructure, technical compliance, and minimal disruption to hospital operations.
The project required a reliable network infrastructure to be implemented within an operating healthcare facility, distributing data connectivity across multiple functional areas while maintaining an organized centralized infrastructure, technical compliance, and minimal disruption to hospital operations.
Challenge Description #2
Challenge Solution #2
Project Technical Data
- Location
- Smouha, Alexandria
- Project category
- Network Infrastructure
- Client
- University Hospitals
- Sectors
- Government، Private Sector
- Executed services
- 7
- Project date
- 2025-07-24
Project Delivery Journey
A clear sequence from survey and planning through testing and handover.
-
01
Site Survey & Requirements Review
Reviewing the site and technical drawings to determine data outlet requirements, cable routes and network distribution points.
-
02
Design & Engineering
Preparing the implementation plan, cable routes and data outlet distribution in accordance with project technical specifications.
-
03
Infrastructure Path Installation
Preparing and installing the required pathways for structured cabling and passive infrastructure.
-
04
Structured Cabling Installation
Installing, organizing and labeling structured cabling and connecting it to the designated distribution points.
-
05
Data Outlet Installation
Installing and commissioning 250 data points throughout Smouha University Hospital and integrating them with the centralized network infrastructure.